A Specialist Consultancy exclusively focused on developing planning consented sites for Photovoltaic Development

Emergent Energy aims to help property owners take advantage of the growing market for Photovoltaic Development ( PVD) in the UK.


Drawing on the wide-ranging expertise of our team, we can manage every stage of the process of developing suitable sites to a planning-consented state, with minimal burden placed on the property owner.


Our wide range of contacts within the industry allows us to seek successful exits and maximise returns to site owners. We work on an open book basis with a pre-agreed profit share.

What we look for

• Rooftop and green field sites

• Minimum 2 acres with no upper limit


• Flat or South-facing land grade 3B or below


• 11 KV electricity line within 1000 m that goes  directly to a sub station; or


• 33 KV electricity line within 500 meters


• No overlooking buildings


• Accessible by articulated lorries


• Not adjacent to areas such as historic  monuments or conservation areas